Star Trek Online Roleplay

🔰 RP Hub => Reports => Topic started by: Brex on March 07, 2021, 10:05:18 PM

Title: Report: U.S.S. Agamemnon Refit Report - Lieutenant Commander Chief Engineer M'Gia Ramai
Post by: Brex on March 07, 2021, 10:05:18 PM


SUBMITTED:
Stardate: 98181.94
FILED BY:
Lieutenant Commander Chief Engineer M'Gia Ramai
SECURITY:
Level 1 - Open



LOCATION: Starbase 514

MISSION: Complete Minor Refit of Agamemnon Systems

OUTCOME: Refit complete, EPS taps refit to 2421 standards.

KEY PERSONNEL:

CAPT Ijhlab, Phill'min
LCDR Ramai, M'Gia
NARRATIVE: The Agamemnon has pulled into Starbase 514 for a minor refit of secondary systems, and our EPS taps, which were not upgraded with the original refit following our arrival here due to the complexities of our unique Warp Core design.

Through slight reverse engineering and more than a few communications with staff at the UP fleet yard, Starbase 514 engineers have been able to facilitate an upgrade at last. Flow regulators are handling the increased plasma flow within expected limits and EPS waveguides are green across the board. Total time for install was 5 hours, and system was restored within a 2 hour window. The next time we return to port, I owe my staff a meal.

RECOMMENDATION: No action necessary, refit complete with minimal downtime




OOC: